8
9
587
Shanghae. Hips and ridges to be - formed with well tempered chunam
and coloured.
At the backs of all chimnies cutting the slope of the roof foom
small,
pediment roop
so as to throw
the rain water to each side further
secure
inst leakage by the insertion
-against
of 6 to lead flashings.
Eaves
gutters
cutters
and down pipes
will be supplied by the Colonial Government, but the contractor will
have to provide for their proper fixing.
flooring
boards
uirting
Eaves que
and Pop
Ground floor joists to be of Regon Flocis
pine 7 x 3 spaced 12 apart and
supported by dwarf walls at intervals
not exceeding 6 feet.
"
Upper floor joists to be 14 x 24 spaced 12 apart and stiffend with
Joists
#
stout bridging two rows to each span, Plates under joists to be 6x3 -
The lower floors to be boarded
Singapore wood ploughed,
with 14 inh Singapore
tongued, and
joist
and grooved.
rooved. laid straight
in width's not exceeding
Upper
5 inches
rooms to have similar
floors but only to inches thick.
The skirting to Post office and
lower rooms to be of hard Singapore
"
wood 24 thick and of high plain
chamfered on top, tongued into the
floors and securely plugged to walls
Upper floor
artition walls
rooms to have
skirting it high plain moulded
"
top and 14 thick.
on
The partitions dividing off the
upper storey
in rooms vc to be lath
- and plaster or brick
под
-ad
ве
may directed.
No comments yet.
Private notes are available after approval.